Borchard Surveying and Mapping is committed to providing our clients with the highest quality services. Featured projects include:
MBF Consulting
Project: Rancho Sierra Vista Storm Drain Replacement Project (April 2007)
Location: San Juan Capistrano, CA
Services: Surveying & Mapping
Client Contact: Mike Fakhar, PE
- Field location of newly constructed storm drain lines located within the Rancho Sierra Vista equestrian center.
- Field located easements in relationship to existing property lines and street right of way.
- Prepared legal descriptions and exhibits for said field located storm drains.
Irvine Ranch Water District
Project: University Lift Station Flood Wall (March 2008)
Location: Newport Beach, CA
Services: Surveying & Mapping
Client Contact: Billy Stewart
- Establishment of construction control for field construction staking using the Orange County Surveyor’s GPS control network.
- Provided construction staking for +/- 400 ft. of proposed flood wall.
- Prepared survey staking calculations for all flood wall staking.
Irvine Ranch Water District
Project: On-Call Professional Surveying Services (Ongoing)
Location: Various
Services: Surveying & Mapping
Client Contact: Malcolm Cortez, PE
- Ongoing performance of various professional surveying and mapping duties as requested by client, including legal descriptions and exhibits, easement constraint maps, ALTA surveys on newly purchased facilities, GPS control establishment and construction staking and calculations.
City of Newport Beach
Project: Sunset Ridge Park (Ongoing)
Location: Newport Beach, CA
Services: Surveying & Mapping
- Field surveying to establish and analyze the boundaries and topography of a 7.6 acre park.
- Preparation of an easement constraints, topographic and boundary map to be used to facilitate the design of said park.
Irvine Ranch Water District
Project: Zone 3 San Canyon Ave Domestic Water Transmission Main Replacement
(January 2009)
Location: Irvine, CA
Services: Surveying & Mapping
Client Contact: Billy Stewart
- Establishment of construction survey control for the replacement of approximately 1000 linear feet of 36” water transmission main running under the 405 freeway.
- Preparation of a topographic and easement constraints map for use in facilitating the design of said pipeline.
- Establishment and implementation of a monitoring control project during jack-and-bore construction phase of pipeline project
Irvine Ranch Water District
Project: Los Alisos Pumping Plant (April 2005)
Location: Irvine, CA
Services: Mapping
Client Contact: Ray Thatcher
- Preparation of a Record Boundary and easement constraints map for Ray Thatcher, right of way agent.
Irvine Ranch Water District
Project: Southern California Edison Easements (January 2005)
Location: Irvine, CA
Services: Mapping Services, Legal Descriptions
Client Contact: Ray Thatcher
- Preparation of a legal description & exhibit for a Southern California Edison easement at the Request of Ray Thatcher, right of way agent.
Irvine Community Development Company
Project: Quail Hill (PA-17) (May 2005)
Location: Irvine, CA
Services: Mapping, Legal Descriptions
Client Contact: Terry Hartman
- Preparation of various legal descriptions for sewer, water, storm drain & access purposes for the City of Irvine, Irvine Ranch Water District & The Irvine Community Development Co.